The main church heating system boiler was installed in 2000. Oil is ordered when the oil level gets to level 2 bars of below. 1000 litres of oil for Eccleston Church was last ordered on the 24th Jan 2024. The vestry night storage heaters were installed in 1970.
The ‘Hamworthy Broadstone 2R9’ Boiler (and ‘AHE’ Air Conditioning Unit) were serviced by James Mercer Group in 2021, but have not been serviced since.
Date | Electric Rate 1 (Day) | Electric Rate 4 (Night) | Water | Oil Level |
2023-12-12 | 62,883 | 54,652 | 3 | |
2024-01-14 | 63,450 | 55,687 | 3 | |
2024-01-28 | 63,717 | 56,140 | 306 | 7 |
2024-02-25 | 64,165 | 56,999 | 314.904 | 7 |
2024-03-04 | 314.912 | 7 | ||
2024-03-14 | 64,236 | 57,014 | 315.317 | 7 |
2024-03-24 | 64,362 | 57,037 | 315.716 | 7 |
2024-04-17 | 64,457 | 57,158 | 7 | |
2024-04-30 | 315.835 | 7 | ||
2024-05-12 | 64,520 | 57,165 | 316.026 | 7 |
2024-06-21 | 64,623 | 57,177 | 316.572 | 7 |
2024-07-14 | 64,730 | 57,184 | 317.588 | 7 |
2024-07-28 | 64,754 | 57,188 | 317.710 | 7 |
2024-08-14 | 64,794 | 57,194 | 317.912 | 7 |
2024-08-25 | 64,864 | 57,197 | 319.090 | 7 |
The Church clock was last adjusted 17th April 2024 (clock 5 minutes slow)